Watch the video here.
My constituency question is for the Minister for Energy and Resources. Minister, what is the expected time frame for the completion of the neighbourhood battery to be installed in Queenscliff? This battery is one of 100 that is being built across our state which will soak up that excess rooftop solar energy, resulting in the reduction of emissions and assisting to lower power bills for locals. In a time when many constituents in my electorate are mindful of their power bills, this battery is an important measure and will be a welcome relief for residents across the community. I am sure my electorate would be excited to hear an update on the time frame for this installation and completion. I look forward to hearing from the minister and sharing this response with my constituents.